NSA-G (Swing-Space)
SCIF'ed Mission OPS at NSA-G was limited to support the 800-man build-out requiring a permanent but quick solution. SC managed the design and construction of a SCIF'ed Modular Building to house the 800-man build-out reaching FOC (Full Operating Capability) in less than 6-months. The facility was SCIF'ed using a unique method easily passing Accreditation.

Asia
SC has worked multiple SCIF projects across Asia. From small Shielded Enclosures to building and relocating fully SCIF'ed Mission OPS facilities the same quality of shielding designs, technical guidance, shield inspections and testing, and installation methods tailored to the project are applied. Accreditation standards are always met and exceeded without having to modify or remove finished work.

NSA-HQ
SC was responsible for the rehabilitation of over 1.2 Million SF of SCIF space within the NSA Complex. These spaces housed Super Computer centers, major Utility infrastructures, and 24/7/365 missions where there could be no downtime. To accomplish this SC developed a new cleared construction process that cut costs by 33%, increased construction schedules by over 50%, and improcved the award of a contract process such that most contracts could be awarded within a three to seven day period.

C2F Phase-3
Ongoing - SC is contracted to provide RF Shielding guidance, Design Reviews, Design Details, RFI reviews and input, RF Training, OnSite Inspections, and Troubleshooting. The project spans a three plus year performance period.

ECB-3
Ongoing - East Campus Building-3 is a multi-story SCIF Facility nearing 1M SF. SC's contracted to review the Design Build documents, provide Technical design details and guidance, train personnel in types of materials used, proper installation, inspection, repair procedures, and testing. SC will prepare the QA/QC document draft and assit in preparing and responding to RFI.